Cooperation

Banner
Banner

БКУ

Banner

Нефтемаш

Banner
Banner
Banner

Kustovie BU dlja SNG Print

 Cluster Drilling Rigs for “Surgutneftegaz” 

       According to the contract signed in December 2013 with “Surgutneftegaz”, “Uralmash Oil and Gas Equipment Holding” has manufactured and delivered ten cluster drilling rigs BU 4000/250 EК-BMC to the fields of Western Siberia in 2015.
       Drilling rig BU 4000/250 EК-BMC designed according to the individual requirements of Surgutneftegaz specialists, is made in a modular version, equipped with an electric AC variable-frequency drive with a digital control system, for deep development cluster drilling and exploration drilling of vertical, directional and horizontal wells of up to 4000 meters depth.
 

       Photos from the check assembly site and the field

 


© ООО «Уралмаш НГО Холдинг»        Phone: (495) 783-05-67       Fax: (495) 783-05-68        E-mail: info@uralmash-ngo.com


 
 
 
 
Create & Design: Dipolle Art