Cooperation

Banner
Banner

БКУ

Banner

Нефтемаш

Banner
Banner
Banner

DELIVERY OF A DRILLING RIG TO URENGOYSKOYE FIELD Print

According to the contract signed in February 2013 with Siberian Services Company, “Uralmash Oil and Gas Equipment Holding” has manufactured and delivered a drilling rig BU 5000/320 EК-BMC to Urengoyskoye oil and gas condensate field.

 

 The drilling rig BU 5000/320 EК-BMC is designed for cluster drilling of oil and gas wells of up to 5000 m depth. It is equipped with an electric AC variable-frequency drive with a digital control system. The drilling rig arrangement enables skidding of the whole complex along the skids from one well to another together with the set of drilling pipes installed on the setbacks and suspended blowout prevention equipment.

 

 

Photos from the check assembly site and the field

 

 


© ООО «Уралмаш НГО Холдинг»        Phone: (495) 783-05-67       Fax: (495) 783-05-68        E-mail: info@uralmash-ngo.com


 
 
 
 
Create & Design: Dipolle Art